2023-05-09T04:52:20
Inspection for grant of licence or loan licence for Class C or Class D
medical device
(1) Before grant of licence to manufacture for sale or for distribution in
respect of Class C or D medical device, the manufacturing site shall be
inspected within a period of sixty days from the date of application by a team
comprising not less than two Medical Device Officers which may include any
officer senior to the Medical Device Officer with or without an expert, or a
Notified Body referred to in sub-rule (4) of rule 13:
PROVIDED that no inspection of a medical device manufacturing site for
grant of loan licence to manufacture such medical device shall be required to
be carried out if the manufacturing site is already licensed to manufacture
such medical device for sale or for distribution.
Central Drugs Standard Control Organization, Ministry of Health and Family Welfare, Govt. of India Page 28 of 248
(2) The composition of the inspection team referred to in sub-rule (1)
shall be determined by the controlling officer and no inspection shall be
carried out without prior approval of the controlling officer.
Have a question? Ask here!
Required fields are marked *